Akdeniz Electricity Distribution Inc.

You are here:

12 km of the double circuit 3 × 266 MCM conductor power transmission line that feeds Manavgat from TEİAŞ’s Alanya Konaklı transformer center was disassembled and replaced with 4 circuits 3 × 477 MCM conductors and 4 circuits 3 × 477 MCM conductors were supplied with energy from the double circuit. The line was accepted by TEDAŞ in perfect and working condition and delivered to AEDAŞ. Our company has completed and commissioned the installation works of the excavation, filling, cabling and lighting poles in the central refuge lighting facility work on the 2.3 km crossroad within the scope of the Illumination Work of Antalya Central Democracy Intersection, which was taken into the investment plan by AEDAŞ investment directorate in 2016. It was accepted by TEDAŞ completely and delivered to Akdeniz Electricity Distribution Inc. Co. E

Within the scope of the Finike Sahilkent-Elmalı Highway Lighting work, which was taken into the investment plan by the AEDAŞ investment directorate in 2017, excavation, filling, cable installation, 136 lighting pole installation and 2 transformer center facilities were put into operation and accepted by TEDAŞ. The old poles of the pigeon conductor (3/0) Kundu energy transmission line belonging to Akdeniz Electricity Distribution Inc. Co. were disassembled and 477 mcm conductor new energy transmission line poles were assembled. The facility was accepted by TEDAŞ and delivered to AEDAŞ.

AKDENİZ EDAŞ Investment Directorate

Within the scope of the Finike–Sahilkent–Elmalı highway lighting project, which was included in the 2017 investment plan of the AKDENİZ EDAŞ Investment Directorate, our company carried out excavation, filling, cable installation, and the installation of 136 lighting poles along the 4.5 km median lighting line. In addition, 2 transformer substations were constructed, commissioned, and successfully handed over to TEDAŞ without any deficiencies.

Furthermore, the poles of the pigeon-conductor (3/0) Kundu power transmission line belonging to AKDENİZ EDAŞ, which had reached the end of its economic life, were dismantled and replaced with new poles equipped with 477 MCM conductors. The facility was put into operation, its acceptance procedures with TEDAŞ were completed, and it was officially delivered to AKDENİZ EDAŞ.

Excavation, filling, cable assembly and installation of lighting poles on the 2.5 km road route of the EXPO 2016 fairground main access road within the scope of the Lighting of the Intersection has been completed and the system has been delivered to AEDAŞ in working condition.

Our company established and commissioned excavation, filling, cable assembly, lighting pole assembly and 1 transformer center within the scope of the central refuge lighting facility located on the 6 km route of Kaş-Kalkan highway, which was taken into the investment plan by the AEDAŞ investment directorate in 2016, and it was accepted by TEDAŞ.

The old poles of the pigeon conductor (3/0) Saklıkent energy transmission line belonging to Akdeniz Electricity Distribution Inc. Co. were disassembled and the new poles were assembled. The acceptances were made completely by TEDAŞ (Turkish Electricity Distribution Corporation) and delivered to AEDAŞ (Akdeniz Electricity Distribution Inc. Co.). Excavation, filling, cable assembly, 265 lighting pole installation and 4 transformers within the scope of the central refuge lighting facility located on the 13 km route of the 2nd stage of the Antalya Western Ring Road, which was taken into the investment plan by our Company’s 13th Regional Directorate of Highways in 2016, were accepted by TEDAŞ completely.

Alanya

Demokrasi Kavşağı

Finike

Isparta

Kaş

Kundu