The old poles of the pigeon conductor (3/0) Saklıkent energy transmission line belonging to Akdeniz Electricity Distribution Inc. Co. were disassembled and the new poles were assembled. Their admissions to TEDAŞ were prepared in full and delivered to AEDAŞ. Excavation, filling, cable assembly, 265 lighting pole installation and 4 transformers within the scope of the central refuge lighting facility located on the 13 km route of the 2nd stage of the Antalya Western Ring Road, which was taken into the investment plan by our Company’s 13th Regional Directorate of Highways in 2016, were accepted by TEDAŞ completely.
Within the scope of the Finike Sahilkent-Elmalı Highway Lighting work, which was taken into the investment plan by the AEDAŞ investment directorate in 2017, excavation, filling, cable installation, 136 lighting pole installation and 2 transformer center facilities were put into operation and accepted by TEDAS. The old poles of the pigeon conductor (3/0) Kundu energy transmission line belonging to Akdeniz Electricity Distribution Inc. Co. were disassembled and 477 mcm conductor new energy transmission line poles were assembled. The facility was accepted by TEDAŞ and delivered to AEDAŞ.