You are here:

Displacement of Turkish Telecom Lines, Material Supply and Installation Works (Section 6 Between Kurtköy-Akyazı)

Preparation of Telecom infrastructure displacement projects that prevent road construction within the scope of the 6th Section project including the Northern Marmara Motorway (including the 3rd Bosphorus Bridge) Kurtköy-Akyazı, Telecom infrastructure channel opening for transferring existing cables, laying pipes in various sizes and numbers, installation of prefabricated concrete manholes, horizontal drilling works were done. In addition, copper and fiber cable drawing works, addition and termination, pole erection and Superonline, Municipality and International Fiber cable drawing additional and terminations of Telecom were also carried out.

Displacement of Türk Telekom Lines, Material Supply and Installation Works (5th Section Between Kurtköy-Akyazı)

Preparation of Telekom infrastructure displacement projects that prevent road construction within the scope of the 5th Section project including the Northern Marmara Motorway (including the 3rd Bosphorus Bridge) Kurtköy-Akyazı, Telecom infrastructure channel opening for transferring existing cables, laying pipes in various sizes and numbers, installation of prefabricated concrete manholes , horizontal probing works, additional copper and fiber cable drawing works belonging to Telecom and termination, direct erection and Superonline, Belediye and International Fiber cable drawing additional and terminations were done.