H.627T 154kV (~19.7km) 2x1272MCM, (~8,8km) 1272MCM Erbaa- Yaprak HEPP (Renovation) ETL Surplus Balance Works, 154kV (Çarşamba-Erbaa) BrşN-Yaprak HEPP ETL Supply of and Installation Works ~ 2,4km OPGW Protection Wire between Branch Pole and Yaprak HEPP TM portal

Within the scope of ‘’H.627T 154kV (~19.7km) 2x1272MCM, (~8,8km) 1272MCM Erbaa- Yaprak HEPP (Renovation) ETL Surplus Balance Works, 154kV (Çarşamba-Erbaa) BrşN-Yaprak HEPP ETL Supply of and Installation Works ~ 2,4km OPGW Protection Wire between Branch Pole and Yaprak HEPP TM portal’’ of which contract was made between Turkey Electricity Transmission Inc. Co. and our company on 15.09.2020, 1272 MCM, OPGW protection conductor and 70mm2 protection conductor installation was made by us, energized on 12.01.2021 and included in the Turkey Electricity Transmission System.