There are a total of 6 stations in the project.
- Çerkezköy Passenger Station
- Çerkezköy Freight Station
- Büyükkarıştıran Station
- Lüleburgaz Station
- Babaeski Station
- Edirne Station
Within the scope of the project, the production of 2 new transformer centers for the supply of traction power and the renovation of the existing Edirne Transformer center, the installation of the catenary system of the entire line, including the modification of the existing line and the catenary at the connection points, auxiliary service transformers for power supply, low voltage