İGA Istanbul Airport Energy Works (3rd Airport)

You are here:

Power transmission lines, medium-voltage underground cables, and monoblock concrete
substation transformer centers were installed to meet the temporary energy needs during
the construction of the IGA 3rd airport. Testing and acceptance procedures were completed by Boğaziçi Electricity Distribution Inc. Co. and TEDAŞ Boğaziçi Regional Directorate. For the purpose of meeting permanent energy needs, 154 kV ENH and Reducer Transformer Center Design and Installation Works were carried out.