In the Kuwait Al Mutlaa Project, which is under construction within the scope of the main contractor Sallini-Kolin JV, Energy Transmission lines that coincide with the main road routes are re-designed and displaced in order to make them comply with Kuwait MEW specifications. Within the scope of the work, approximately 115 poles will be displaced at 400,300,132 and 33 kW and it is the largest variant project realized in Kuwait in recent years. All of the work (design, material supply, assembly) was done by Turkish engineers and workers.