Northern Marmara Motorway TEİAŞ Energy Transmission Lines Displacement, Material Supply and Installation (5th and 6th Section KM: 151 + 500-251 + 111) Marmara Highway Construction Ordinary Partnership Commercial Enterprise

All of the displacement works including material supply, assembly and disassembly of 154 and 380 kV Energy Transmission Lines in the Kurtköy-Akyazı section of the Northern Marmara Motorway Project (including connection roads) were done by our company.

74 poles in 15 lines were displaced despite the difficulty of conducting the work since it is most complex and problematic area among Turkey’s energy transmission corridors. The project was completed in 2018.

Northern Marmara Motorway TEDAŞ Energy Transmission Lines Displacement, Material Supply and Installation Works (5th and 6th sections between Kurtköy-Akyazı)

The Northern Marmara Motorway, which is an important transportation investment for our country, intersected with the existing Medium Voltage Electricity lines at different points during the construction phase. The aforementioned existing lines have been designed in accordance with the superpose projects created by overlapping the highway route. The passages made under the highway were enclosed in a concrete enclosure and the highway and energy transmission line have been provided uninterrupted continuation. The project was completed in accordance with technical specifications and completed on turnkey basis.