Reconstruction Work of Sincan-Ankara-Kayaş Railway Road (Baskentray)

Within the scope of the electrification (Catenary) Disassembly between Sincan-Ankara, Signalization Disassembly between Sincan-Ankara and Cable Offset between Sincan-Ankara (reconstruction of Sincan-Ankara-Kayaş line) electrification systems work, 69 km catenary line disassembly and construction of the variant line were carried out.

Electrification (Catenary) System Works

In this project, the connection of passenger and freight trains coming to Ankara from Istanbul-Eskişehir-Konya-İzmir -Afyon direction to the east of our country by HST and Conventional lines is aimed. The project, which consists of 24 stations, including Sincan-Ankara-Kayaş main station, consists of 2 HST lines with a length of 36 km and 2 Conventional lines. It includes 160 km of electrification line together with the side roads. Electrification lines were equipped with signaling systems and were controlled from the Scada Center.