Within the scope of the electrification (Catenary) Disassembly between Sincan-Ankara, Signalization Disassembly between Sincan-Ankara and Cable Offset between Sincan-Ankara (reconstruction of Sincan-Ankara-Kayaş line) electrification systems work, 69 km catenary line disassembly and construction of the variant line were carried out.
Reconstruction Work of Sincan-Ankara-Kayaş Railway Road (Baskentray)
Electrification (Catenary) System Works
In this project, the connection of passenger and freight trains coming to Ankara from Istanbul-Eskişehir-Konya-İzmir -Afyon direction to the east of our country by HST and Conventional lines is aimed. The project, which consists of 24 stations, including Sincan-Ankara-Kayaş main station, consists of 2 HST lines with a length of 36 km and 2 Conventional lines. It includes 160 km of electrification line together with the side roads. Electrification lines were equipped with signaling systems and were controlled from the Scada Center.