Electrical installation works of the dock reconstructed in order to provide service to more ships and to meet the electricity needs of the ships that will anchor the dock during the construction phase of Sefine Shipyard have been made and the electrical system of the floating dock, which is under construction at a length of 285 meters, has been supplied with 3.3 kV 60 Hz electricity.