Reconstruction Work of Sincan-Ankara-Kayaş Railway Road (BAŞKENTRAY)

You are here:

Within the scope of the electrification (Catenary) Disassembly between Sincan-Ankara, Signalization Disassembly between Sincan Ankara and Cable Offset between Sincan Ankara (reconstruction of Sincan-Ankara-Kayaş line) electrification systems work, 69 km catenary line disassembly and construction of the variant line were carried out. Within the scope of the Sincan – Kayaş railway line project, all signaling and telecommunication works have been successfully completed on a turnkey basis to ensure safe, efficient, and controlled train operations.

Signalization Installation Works

The works included the laying of signaling and communication cables along the route, installation of equipment foundations, signal devices, rail circuits, junction boxes, and switch motors. Fiber optic cable terminations, as well as the installation of station cameras and public announcement systems, were also carried out. All technical building interiors were completed, including panel placements. Additionally, the installation of battery systems, arrangement and assembly of components within the CTC station building, installation and wiring of switch heater panels, signal energy transformers, and panel cabling and labeling were finalized. Throughout the process, rail vehicles, cranes, and scoops were actively utilized.

Electrification (Catenary) System Works

In this project, the connection of passenger and freight trains coming to Ankara from Istanbul-Eskişehir-Konya-İzmir -Afyon direction to the east of our country by HST and Conventional lines is aimed. The project, which consists of 24 stations, including SincanAnkara-Kayaş main station, consists of 2 HST lines with a length of 36 km and 2 Conventional lines. It includes 160 km of electrification line together with the side roads. Electrification lines were equipped with signaling systems and were controlled from the Scada Center.