You are here:

H.462 Referenced 400 kV 3B 1272 MCM (~74.5 km) + 154 kV 2x1272 MCM (~74.5 km) Conductive Diyarbakır Çınar TM Connection Complete Facility Work

Our work continues on the Power Transmission Line consisting of 208 poles located within the borders of Diyarbakır, Mardin, and Şanlıurfa provinces. It is planned to be completed and energized as soon as possible.