Elazığ OSB 5th Section 2nd Stage HV-LV Electricity Network Construction Work

A major investment that marks a leap forward in energy in the Elazığ Organized Industrial Zone

According to the contract signed on July 16, 2025 between our company and the Elazığ Organized Industrial Zone Entrepreneurship Board, work has commenced on the Elazığ OSB 5th Section 2nd Stage HV-LV Electrical Network Construction Project. Its aim is to provide uninterrupted energy to industrial establishments in the region.

WORK TO BE CARRIED OUT UNDER THE PROJECT

  • 100 km of High Voltage Cabling Energy transmission lines will be modernized using 1×400 mm² ALU XLPE type high-voltage cables.
  • Installation of 9 Transformer Stations Compact-type transformer stations with concrete enclosures will be installed for distribution.
  • 15.000 m³ Channel Construction
    All infrastructure will be protected from external factors
    underground.

100 km

High Voltage Cabling

9 Pieces

Transformer Stations Installation

15.000 m³

Channel Construction
The project will be completed in 2025 transforming the Organized Industrial Zone into a
model center in energy infrastructure.