You are here:

Verbana-Alibeyköy ETL Referenced H.334 with 380 kV 2X3B 1272 MCM and 3B 1272 MCM Conductor Surplus Balance Works, Bid Unit Price Complete Installation Work

As the 3rd Contractor, we are continuing the construction of transmission line for the power generation from Verbena Natural Gas Closed Cycle Power Plant of which project design and construction has been continuing since 2014 and which will supply most of the energy need of Istanbul and is planned to be constructed in Tekirdağ.