Despite the challenging conditions of the region of Sanayi Neighborhood, İpek Neighborhood, Fırat Neighborhood and Bahçelievler Neighborhood in Mardin Kızıltepe district, our 1st group works under our commitment as Armin Electric and 3rd Group Ortaköy Neighborhood and Gökçe Neighborhood located in Mardin Artuklu District, 3000 pieces of poles, 2900 pieces of pole type panels and 180 pieces of building type panels 170000 M AER conductor 350000 M subscriber cable have been supplied with in a short period of time (5 months), superstructure problems of the whole field area will be solved according to the current conditions.