Northern Marmara Natural Gas Storage TEVSİ Project Supply Construction – Electric Displacement Works

Within the scope of Northern Marmara Natural Gas Storage TEVSİ Project Supply Construction – Electric Displacement Works, 34.5kV 2x3x477 energy transmission line located in the excavation work area was canceled and 18/18 concrete poles outside the excavation area are installed to CMC Center (Prefabricated Concrete Kiosk) with 2×4 (1×240) CU XLPE cables. Existing BOTAŞ facilities will be energized from the CMC Center. The facilities to be built within the scope of the CMC Center Northern Marmara Natural Gas Storage TEVSİ Project will be put in order to be energized in the future.