Reconstruction of Sincan-Ankara-Kayaş Train Line (Başkentray) Signalization Installation Works

Signaling and telecommunication works are carried out on a turnkey basis in line with the project in order to ensure that the trains can go on the rail between Sincan – Kayaş and communicate in a controlled manner. Laying the equipment foundations by pulling the signaling and communication cables along the way, installing the signal equipment, rail circuit, junction boxes, switch motor installation and settings, termination of fiber cables, station camera and announcement installations, placing panels in technical buildings works including the interiors of technical buildings are carried out and brought into operation. Installation of batteries, arrangement and assembly within the station CTC building, switch heater panel and wiring, signal energy transformer, panels wiring labeling works are carried out. In these works, rail vehicles, cranes, scoops are used.