H.807 Referenced 154 kV, 1272 MCM Conductor Uludere-Beytüşşebap- Hakkâri ETL (~54.00 km) Dr. No.148 –311 Section 2 Complete Facility Project

We are continuing our facility work within the borders of Hakkâri and Şırnak provinces, and our work continues on the Power Transmission Line consisting of 164 poles. Despite the difficult terrain conditions, it is planned to be completed and energized as soon as possible.