Skip to content
You are here:
- Home
- All Projects
Completed Projects
- – Atatürk Dam and Hydroelectric Power Plant Construction Access Roads Final Lighting Work
- – Ankara Concrete Factory Area Lighting Work
- – Albania Laç Housing Project Electrical Installation Work
- – ASELSAN Various Electricity Extension Works
- – ETL Displacement Works Related to the Construction of Afyon Ring Road
- – Ankara Park Fora Restaurant Electrical Works
- – ASKİ Kavşakkaya Dam Electrical Works
- – Akdeniz Elektrik Dağıtım A.Ş. Works
- – AKKÖY I and II HEPP 154 kV (ELT) Energy Transmission Line
- – AKKÖY I HEPP Power House Electrical Works
- – AKKOY II HEPP 34,5 kV ETL Line with 3 × 1/0 Conductor
- – ASO Temelli Organized Industrial Zone Electrical Infrastructure Works Installation
- – Afyon Inkol Concrete Sleeper Factory HV / LV Electrical Facilities
- – Ankara Pozantı Motorway Gölcük-Kemerhisar Section HV / LV Electricity and Telecom Displacement Works
- -Antalya, Kepez III LV + MV + Lighting Network Installation Work
- – Akseki-Aksu-Alanya-Gündoğmuş-Manavgat-Kemer-Korkuteli and Serik Districts Renovation Work of Transformers That Have Completed Their Economic Life
- – Akdeniz EDAŞ (Antalya – Burdur – İsparta) 2014 – 2018 ETL, CMC and HV / LV City Grids Investment Facilities Works
- – Ankara High Speed Train Station Complex Construction Work: Electrical Works / Building Grounding System Works / Catenary System Works / Transformer Center / Energy Transmission Line and 154734.5 kV Additional Transformer Works / Telecommunication, Transmission and Weak Current Systems Installation Works / Signal Energy Supply System Installation and Grounding Works of the Equipment Belonging to the Signalization System
- – Within the scope of Ankara – Istanbul High Speed Train Project, Gebze – Köseköy Line Rehabilitation and Reconstruction Work for the Improvement of the Grounding System of the Line
- – Ankara Pozantı Motorway Gölcük-Kemerhisar Section HV / LV Electricity and Telecom Displacement Works
- – Akdeniz Elektrik Dağıtım A.Ş. Works
- – Antalya Western Ring Road Lighting Network Construction Work
- – Antalya Yaprak HEPP, Berat HEPP and Cansuyu HEPP 154 kV (ETL) Energy Transmission Line Works
- – Ankara-Istanbul High Speed Train Project Phase II Vezirhan-İnönü Part II Karaköy Station, Karaköy Transformer Center and Karagözler Transformer Center 154 kV Connection Lines and High Speed Train Catenary Portal Connections
- – ADM Aydın 2nd Region Facility Construction Work
- – Ajyal Housing Project of Saudi Aramco
- – Ankara-İzmir High Speed Train Project Uşak (Eşme) – Manisa (Salihli) section (between KM: 364 + 600- KM: 438 + 919) Infrastructure Construction HV / LV Partial Displacement Projects
- – Antique Bungalow Beach Houses Power Requirement Electrical Project
- – Prime Ministry Service Buildings Diyarbakır Regional Directorate Electrical Works
- – Bozova Pumped Irrigation Facilities ETL, Transformer Facilities and Building Interior Installation and Assembly Works
- – Bozüyük – Mekece Road Improvement Project I. and II. Part LV / MV and Telecom Displacements Work
- – Bursa Province Orhangazi District Gemlik Street LV / MV Underground City Grid Electrical Works (MV Connection and Lifting of Tr2-32, Tr1-35, Tr1- 36, TM-37, TM-38 TM-40, Tr1-41 AG Branches)
- – Bursa Osmangazi Additional Transformer Plant Construction Work
- – Boğaziçi Elektrik Dağıtım A.Ş. Works
- – Boğaziçi EDAŞ 2014 – 2018 ETL, CMC and HV / LV City Grids Investment Facilities Works
- – Bogazici A.Ş. 2nd and 4th Region General Electrical Works LV-HV Electricity Distribution Facilities Underground Trouble Shooting and Maintenance Operations, Opening/Closing Fault Pit, Top Coating Excluding Asphalt, Transportation of Materials and Excavation Works
- – Bilecik Provincial Directorate of Operation 1. 2. 3. 4. and 5. Group Electrical Installation Works
- – Bilecik Province 1. and 2. Group Small Additional Facilities (KET) Construction Works
- – 154 kV Bahçe-Osmaniye Energy Transmission Line Conductor Installation Works
- – Çanakkale Kolin Hotel Electricity and Automation Works
- – Çanakkale Kepez Port Electrical and Automation Works
- – Çamlibel EDAŞ (Sivas – Tokat- Yozgat) 2014 – 2018 ETL, CMC and HV / LV City Grids Investment Facilities
- – Çamlıbel Elektrik Dağıtım A.Ş. Works
- – Çamsan Ordu MDF 3 Factory Electro-montage Works
- – Çamsan Ordu M.V. Modernization Project
- – Çamlıbel Elektrik Dağıtım A.Ş. Works
- – Electrical Works of Çayyolu Depot Area Construction and Electromechanical Systems Supply, Installation and Commissioning Works
- – Electrical Works of Çayyolu Depot Area Construction and Electromechanical Systems Supply, Installation and Commissioning Works Electrical and Signalization Infrastructure Works
- – Çayırhan Neighborhood ÇEÜMAS A.Ş. Mining Construction Site Facilities HV / LV Electricity Project
- – DSİ Şanlıurfa Drinking Water Project Energy Transmission Lines
- – Diyarbakır Gendarmerie Air Group Command Fire Warning System Establishment Works
- – DSİ Çanakkale Umurbey Dam Electrical Works
- – Eti Holding A.Ş. Kırka 3. Boron Derivatives Plants Complete Energy and Automation Work
- – Elazığ Mehmet Koloğlu Anatolian High School Electrical Works
- – Erzincan Highway Electrical Displacement Works
- – Eskişehir Provincial Directorate of Operation 1. 3. 4. 5. 6. 7. 8. and 9. Group Electrical Installation Works
- – Energy Transmission Line and 154/34.5 kV Additional Transformer Works/Telecommunication, Transmission and Weak Current Systems Installation Works / Signal Energy Supply Water System Installation and Grounding of Equipment Belonging to the Signalization System
- – Gebze TÜSSİDE Service Buildings Renovation, Static Reinforcement and Repair Works, Conference Hall Construction Electrical Works
- – General Staff and Ministry of National Defense Headquarters System Revision Repair Construction Electrical Works
- – Gaziantep- Şanlıurfa Highway Birecik- Suruç Section Highway 154 kV ETL Displacement Electrical and Lighting Works
- – Providing the Connection of Göl İplik cmc – Yenice cmc ETL
- – Complete Installation Work with Offer Unit Price in 25 parts of OPGW facility with a total length of ~ 2850 km to existing ETLs with H.OPGW Reference
- – H.627T 154kV (~19.7km) 2x1272MCM, (~8,8km) 1272MCM Erbaa- Yaprak HEPP (Renovation) ETL Surplus Balance Works, 154kV (Çarşamba-Erbaa) BrşN-Yaprak HEPP ETL Supply of and Installation Works ~ 2,4km OPGW Protection Wire between Branch Pole and Yaprak HEPP TM portal.
- 39
- – H.669 Referenced 154 kV (~ 5.4 km) 1272 MCM and (~ 34.2 km) 2×1272 MCM Conductor Bahçe- Osmaniye 2 (Renovation) ETL Bid Unit Price Complete Installation Work
- – Isparta Center I. Group Voltage Change from 10.5 kV to 34.5 kVa, Dm, Dm/cmc Modification, Additional Tr and Underground Cable LV + MV Grid Installation Works
- – Isparta City Hospitals Project Energy Supply Work
- – İzmir Adnan Menderes Airport LV / HV Electricity Revision and Scada Works
- – İzmirgaz Administrative Building Electrical and Building Automation Works
- – İzmir Teos Marina İşletme ve Tic. A.Ş. HV / LV Electrical Facilities
- – İzmir Natural Gas Primary School Construction
- – Istanbul Ring Road Tunnel and Intersection Lighting Work
- – İnegöl Central LV / MV Grid Installation Work (Tr 3 / 06a)
- – Istanbul New Airport Construction Fiber Cable Displacement Works (3rd Airport)
- – Istanbul New Airport Energy Works (3rd Airport)
- – TEI JSF Project Engine Final Assembly Line Installation Work – Electrical Works
- – Kog-Ata Breeding Farm LV Installation Works
- -Kristal City 27mva Type-C/2 D Distribution and Transformer Centers Project
- – KARGEN Building Cooperative 300 Villa Electrical Installation and Infrastructure Electrical Works
- Halkalı-Kapıkule Railway Line Çerkezköy-Kapıkule Section High Speed Train Project
- – 0-3 Northern Side Road and Atatürk Olympic Stadium Road Lighting Works
- – 34,5 kV 3 x 3/0 AWG Kocatepe- Kaletepe Tunnels ETL Work
- – Northern Marmara Motorway TEİAŞ Energy Transmission Lines Displacement Material Supply and Installation (5th and 6th Section km: 151 + 500- 251 + 111) Marmara Highway Construction Ordinary Partnership Commercial Enterprise
- – Displacement of Northern Marmara Motorway TEDAŞ Energy Transmission Lines Material Supply and Assembly Works (5th and 6th sections between Kurtköy-Akyazı)
- – Displacement of Kuwait South Al Mutlaa Project 400, 300, 132 and 33 kV Energy Transmission Lines
- – Kayseri Stage 4 Rail Transport System Overhead Line Energy Supply and Transformer Power Systems
- – Kayseri 4th Stage Rail Transport System Construction Work Anafartalar-HST Tram Line Construction and Vehicle Supply, Assembly and Commissioning Work and Electromechanical Systems
- – Kuwait South Al Mutlaa Housing Project
- – Kütahya Provincial Directorate of Operation 1st and 8th Group Electrical Installation Works
- – Kütahya-Eskişehir Electrification Maintenance and Repair Work
- – Konya-Polatlı Electrification Maintenance and Repair Work
- – LNG Storage and Gasification Terminal Facility: Electrical Works
- – MSB Devlet Neigborhood Generator Building Construction and Electrical Installation Work
- – Mahmutbey East Bridge Intersection (TEM) and East-West Intersections Road Lighting Work Material Supply and Installation Works
- – Mardin 1st and 3rd Group Plant Construction Works
- – Marmaray Project CR3 Contract Gebze-Halkalı Suburban Line Improvement: Extension of the Catenary System of Halkalı Station Inside Line within the Scope of Catenary Works and Electrification Works
- Marmaray Project CR3 Contract Gebze-Halkalı Suburban Line Improvement: Construction Electromechanical Systems / Catenary Works
- – Marmaray Project CR3 Contract Gebze-Halkalı Suburban Line Improvement: Construction and Electromechanical Systems / European Section Turkish Telekom Underground Displacement
- – Various Solar Power Plants / Antalya (12MW), Burdur (1.3MW), lsparta (3MW), Sivas (16MW), Tokat (4MW) Solar Power Plant
- – Nezihe Koloğlu Primary School
- – Opet Giresun Terminal Filling Facilities Electrical Works
- – Opet Marmara Ereğlisi Terminal and Filling Facilities Electrical Works
- – Opet Mersin Terminal B Facility Loading Pump Electrical Works
- – Osmangazi Elektrik Dağıtım A.Ş. Works
- – 154 kV Paşalar- Tungbilek Energy Transmission Line Displacement Works
- – Sabiha Gökçen Airport USAŞ Catering Unit Electrical Works
- – In the Villages of Silifke and Tarsus Districts, C.M.C. Building Construction and Electrical Installation Work
- – Sivas Center LV / MV Electricity Grid Installation Works
- – Sivas Regional Training and Research Hospital Electrical Displacement Works
- – Sivas Yıldızeli TCDD High Speed Train Electric Displacement Works
- – Reconstruction of Sincan-Ankara-Kayaş Line (Başkent Rail) / Electrification Disassembly between Sincan-Ankara, Signalization Disassembly between Sincan-Ankara, Cable Offset between Sincan-Ankara
- -Sincan-Ankara-Kayaş Train Line Reconstruction Work (Başkentray) / Signalization Installation Works
- – Solarkol Enerji San. Ve Tic. A.S. Roof SPP Application Project
- – 2 x 255 MW Soma Kolin Thermal Power Plant Construction Work: Units and Systems’ Electricity, Instrumentation and Automation Installation Works
- – Şanlıurfa Tunnel and Facilities Supply Construction Energy Transmission Lines, Electricity Supply and Distribution Works
- 41
- – Sefine Shipyard Partial Material Electrical Installation Works of the Newly Established Dock
- – Electrical Works of the Yaylak Plain Irrigation Site of Tahal – Ekinciler- Ictas Ordinary Partnership
- – Tarsus Municipality Water Supply and Stormwater Pump Stations Construction and Scada System Installation and Commissioning Work
- – Tarsus-Nacarlı (Renewal) Energy Transmission Line and (Nacarlı-Yenişehitlik) Brş.-Tarsus (Renewal) Energy Transmission Line Installation Work
- – TCK General Directorate 14 Regional Directoratee Bandırma-Gönen Divided Road HV / LV Electrical Facilities Displacement
- -TCDD Kayseri Northern Crossing Variant Railway Project HV / LV Electricity and Telecommunication Displacement Works
- -Tecer-Kangal Variant Signalization and Telecommunication Displacement Works
- – TCDD Ankara-Sincan Railway Northern Line Extension Project HV / LV Electricity and Telecom Facilities Displacement Works
- – Underground Work of 2x (3 × 477) MCM Energy Transmission Line Passing Over TEM Highway
- – Tokat Center, Erbaa District, Village, Town and Various Cmc Installation Works
- – TCDD Train Station HST Station Construction Project, Catenary and Signalization Disassembly and Assembly Works
- -TCDD Kayseri Northern Crossing Variant (Signalization, Telecommunication and Electrification) Supply Works
- TCDD Ulukışla TM Energy Transmission Line Construction Work
- – Türkiye Elektrik İletim A.Ş. General Directorate (TEİAŞ) Works
- – TUSAŞ Composite Production Building Project
- – Displacement of Turkish Telekom Lines, Material Supply and Installation Works (Section 5 between Kurtköy- Akyazı)
- – Displacement of Turkish Telekom Lines, Material Supply and Installation Works (Section 6 between Kurtköy-Akyazı)
- – Uludağ EDAŞ (Bursa-Balıkesir-Çanakkale-Yalova) 2014-2016 ETL, CMC and HV / LV City Grid Investment Facilities Works 2014-2016 Uludağ EDAŞ (Bursa-Balıkesir-Çanakkale-Yalova)
- – Yalova Sefine Shipyard Electrical Infrastructure Works
- – Yalova Sefine Shipyard Cargo Ship Electrical Equipment Works
- – Usak Provincial Directorate of Operation Electrical Installation Works
- – Uşak Province 1st Group Small Additional Facilities (KET) Construction (2019)
- – Zonguldak Çaycuma Airport Runway Lighting and Control Works
Ongoing Projects
- – AKM (M4) – Kızılay Line Construction and Electromechanical Systems Supply, Assembly and
- Commissioning Works
- – Başkent Catenary and Energy Supply Works of Başkent Stations
- – Bilajara Maintanence Center Modernization
- – Dudullu-Bostancı Metro Construction and Electromechanical Works, Underground Transfer Centers (Parking Lots), Depot Area, Management Building and Control Center Construction
- – Verbana-Alibeyköy ETL Referenced H.334 with 380 kV 2X3B 1272 MCM and 3B 1272 MCM Conductor Surplus Balance Works, Bid Unit Price Complete Installation Work
- – İzmit OYAK NYK Ro-Ro Denizcilik ve Liman İşletmeleri A.Ş.
- – İTM.315 Referenced 154 kV Rize Substation Renewal (DOKAP) Construction Work
- – İzmir Business Center Construction Project
- – Northern Marmara Silivri Gas Storage Off-Shore Facilities
- – Northern Marmara Natural Gas Storage TEVSİ Project Supply Construction-Electric Displacement Works
- – Northern Marmara Topside Building Electrical and Instrumentation Works
- – Mechanical Automation Supply and Assembly Supervision, Testing and Commissioning Work
- – Extension of 154/33 kV Pekmezli Substation (GAP)
- – 154 kV Çatalca WPP – Silivri ETL 154 kV Büyükçekmece – Çatalca WPP ETL 154 kV Habipler – New Airport GIS ETL OPGW Supply and Installation Works
Go to Top