As an extension of the existing tram line in the city, this project has been successfully completed, offering a modern and efficient rail system that benefits from the city’s wide layout and ease of transportation. Constructed over a total length of 15 kilometers, the tram line entered test operation in 2022 and was officially opened for public use in 2023. Undertaken in partnership with Kolin-Uzka, the tramway project stands out as one of Armin’s key urban rail system implementations.
While it features a simpler assembly process compared to High-Speed Train (HST) projects, it has been executed with the same level of precision and commitment to quality. Unlike HST and conventional railway lines, the tram system does not require high voltage infrastructure, eliminating the need for return conductors in the grounding system. This allowed for a streamlined construction process tailored to the specific needs of urban transit.

