The double-line catenary systems installed between Polatlı (000) and Konya (213+284), including Line 1–Line 2 and Line 3–Line 4, have been successfully completed in accordance with EN50317, EN50119, EN50124, EN50125 and other relevant standards. These systems were designed and implemented in line with the operating speed requirements specified by the Employer.
Within the scope of the project, the electrification works in the Konya Station region were completed with the installation of four traction transformer substations located in Kocahacılı, Çayırbaşı, Gözlü, and Aşağıpınarbaşı. In addition, 4 neutral sections, 5 sidings, and 2 traction posts were fully constructed and commissioned.
All SCADA equipment, neutral zone systems, and 25,000/220V auxiliary service transformers that supply energy from the HighSpeed Train catenary system between Polatlı and Konya were successfully installed. This included full responsibility for the auxiliary service transformers (from the catenary side to the 220V output of the transformer), as well as the implementation of grounding systems in compliance with safety standards.
Our company has also carried out all associated maintenance, repair, testing, measurement, and fault detection work, ensuring the safe and continuous operation of the entire system.