A total of 3.000 poles, 2.900 pole-type panels, and 180 building-type panels were supplied and installed, along with 170.000 meters of AER conductor and 350.000 meters of subscriber cable.
Despite the challenging conditions in the Sanayi, İpek, Fırat, and Bahçelievler neighborhoods of Mardin Kızıltepe district, as well as Ortaköy and Gökçe neighborhoods in Mardin Artuklu district, our teams at Armin Electric have successfully completed the project within a short period of 5 months.
A total of 3.000 poles, 2.900 pole-type panels, and 180 buildingtype panels were supplied and installed, along with 170.000 meters of AER conductor and 350.000 meters of subscriber cable. These efforts have effectively resolved the superstructure problems across the entire field area, adapting to the existing conditions and ensuring reliable infrastructure for the region.