The work related to the ITM. 364 Reference 154 kV Özalp Transformer Center (DAP) (Van) Construction Project, which was under our responsibility under the contract signed with TEİAŞ, has been completed and the facility has been put into operation.

A 4-bay 154 kV switchgear has been installed in the main busbar + transfer busbar arrangement, and according to the single-line diagram, 2 x 154 kV line feeders, 2 x 154 kV transformer feeders, 1 x 154 kV transfer feeder, 1 x 154/33.6 kV 50(62.5) MVA power transformer has been supplied. The Metal-Clad building, consisting of a basement floor for cable galleries, a metal-clad hall, and auxiliary service transformer halls, the Security building, and the ground floor consisting of a control building, communication room, battery rooms, offices, toilets, kitchen, etc., has been constructed. A completely new, 36kV metal- clad switchgear suitable for a 2-piece single busbar arrangement has been installed. In the metal-clad hall, 2 MV busbars suitable for a single-line diagram have been equipped with 9 output feeders each. The installation of Camera Security Systems (CCTV), Environmental and Switchgear Lighting works, Fire Systems, and control and protection systems have been installed in accordance with current regulations.