Works on the ITM.356 Referenced 380 kV Atatürk 380 Transformer Center Expansion (GAP) Construction Project is continuing uninterruptedly

The main work items that make up the project are listed below: Two transformer feeders (2 x 50/62.5 MVA power transformers and all primary equipment with control and protection cable connections), one autotransformer feeder (250 MVA autotransformer and all primary equipment with control and protection connections), and the transfer of all existing 34.5 kV, 170 kV (6 feeders), and 400 kV (8 feeders) and AC-DC-RTU panels to new control panels are needed.

The new control panels will have camera security systems (CCTV), environmental and switchyard lighting works, and a basement floor for cable gallery purposes. A metal-clad building is also needed. This building will have a ground floor with a metal-clad hall and auxiliary service transformer halls. It will also have a perimeter wall surrounding the entire site and barbed wire fencing surrounding the open switchyard. The newly established feeder areas will be gravelpaved in accordance with regulations. Concrete roads will be constructed in the enclosed switchyard.