Çerkezköy-Kapıkule Railway Line Construction Project

You are here:

Halkalı-Kapıkule Railway Line Çerkezköy-Kapıkule Section Construction Project, Telecommunications and Signaling Installation Works

As part of the high-speed train project between Çerkezköy and Kapıkule, a new double track railway with a design speed of 200 km/h is being constructed for the Çerkezköy-Kapıkule section.

Four new stations are to be constructed between Çerkezköy and Kapıkule, with the new lines to be connected to the two existing stations in Çerkezköy and Edirne. All signaling equipment at these stations will be replaced, and the new system will be integrated into the
existing CTC Center. The new doubletrack line will be equipped with ERTMS Level 1 and will be upgradeable to ERTMS Level 2.

  • Automatic Train Protection and Control Systems (ERTMS/ETCS Level-1)
  • Electronic Interlocking and Subsystems CTC Control Center and Subsystems
  • Double-Track Bidirectional Track-Side Signals
  • Technical Equipment Building and Other Buildings for Maintenance and Operation Purposes
  • Power Supply, Distribution, and UPS (Uninterruptible Power Supply) Systems
  • Roadside Signal Systems
  • Harmonization Between the Signal System to be Installed on the Çerkezköy-Kapıkule Section and the Existing System
  • Harmonization between the Signaling System to be Installed on the
  • Çerkezköy-Kapıkule Section and the Signaling System to be Installed on the Çerkezköy-Ispartakule Section
  • Other Signaling Subsystems,
  • Hot Axle Box Detector